Yamaha Keyboards & Synthesizers

Filter products

Select options to show products with those features:

    Korg Nautilus & Kronos

    Korg Nautilus & Kronos 2

    Korg's premium line of studio workstations, including the flagship Nautilus and Kronos models.
    Korg PA Series

    Korg PA Series 1

    Korg instruments offer a contrasting approach in style and control to Yamaha, with the Pa5X as their current flagship arranger.
    Yamaha Montage-M & MODX-M Synths

    Yamaha Montage-M & MODX-M Synths 2

    Including the Yamaha Montage-M and MODX-M ranges of powerful synths.
    Yamaha PSR-SX Series

    Yamaha PSR-SX Series 3

    The Yamaha SX series feature technology developed for the flagship Genos keyboards, offering a sort of 'portable Genos/Genos 2'.
    Yamaha Genos 2

    Yamaha Genos 2 1

    Genos 2 is Yamaha's flagship arranger keyboard - the most powerful keyboard instruments Yamaha has ever produced.
    Yamaha YC, CK & CP Series

    Yamaha YC, CK & CP Series 5

    Yamaha CK, YC and CP series stage pianos, designed for the performing or recording musician, and loaded with controls.
    Reface Series

    Reface Series 4

    Yamaha reface instruments are compact homages to signature Yamaha synths and piano instruments.
    Yamaha Beginner Keyboards

    Yamaha Beginner Keyboards 9

    Featuring the F, E and EW series of Yamaha keyboards; ideal ranges for beginners and budget-conscious players.
    Yamaha Piaggero

    Yamaha Piaggero 2

    Super lightweight and compact piano instruments, featuring a soft organ-style key action.
    Used Keyboards

    Used Keyboards 25

    Our used keyboards include a 12-month warranty, full QC inspection and FREE UK mainland delivery.